Project Management

On the owner's side, from brief to handover.

We set up how your project is run and follow it through with the people delivering it: who is responsible, what happens when, what changes cost, and which decisions are needed next.

Management and project-controls scopes can be defined for building and industrial projects.

Co-founder Mehran Farrokhrouz brings 34 years on oil, gas, refinery and petrochemical projects — experience gained before HUMAY. Background →

Health Check — you receive: a clear picture of progress, cost and open issues · the few decisions that matter most now · a recommended way forward, with who does what.

A worker breaks up concrete at the foot of tall process columns and steel structures on a clear day
Industrial site, Iran — not a HUMAY project
Our role

Our role and authority are defined in the agreed scope. Technical design, statutory supervision and approvals remain with the appropriately appointed qualified parties.

What the owner receives each week

One page: progress, cost, decisions, risk.

Short, regular and in plain language.

Owner summary · one pageIllustrative sample — not project data
Week 6 of 12One milestone at risk
Progress
Joinery on site; ceilings waiting for approval
Cost
Within approved budget; one change pending
Decisions needed from you
Light fittings (by Monday) · glazed partition (by week 6)
Main risk
Fire alarm approval; consultant following up daily
A large white storage tank with a diagonal stair, spherical tanks beyond, under a clear sky
Industrial site, Iran — not a HUMAY project

The same discipline at every scale: one record of scope, programme, cost and decisions, from a shop fit-out to an industrial plant.

01

Scope & responsibilities

A drawn floor plan on a desk beside a photo of the empty unit
Concept image

Most problems start with something nobody wrote down: what is included, who decides, and who answers when two contractors meet at the same wall.

See the sample
Villa renovation · who does whatIllustrative sample — not project data
ActivityOwnerDesignerContractorHUMAY
Choose finishes and fittingsApprovesProposes options—Checks cost and programme effect
Issue construction drawings—Prepares and issuesReviews for buildabilityTracks dates and comments
Weekly progress reportReceives; decides open items—Provides progress and site dataPrepares the owner report

Bold marks the party responsible for the result.

Possible outputs: scope statement · responsibility matrix · project execution plan

02

Planning & Project Controls

Two engineers in hard hats walk the access road beside a pipe rack in daylight, one pointing along the line, the other holding drawings
Concept image

Available as a standalone assignment or within project management, for owners, contractors and project managers.

A programme and controls everyone can read: each milestone, where it stands, and the next action that keeps it moving.

Plant upgrade · pump package · milestones and controlsIllustrative sample — not project data
Process datasheet issuedWeek 2Done
Vendor drawings approvedWeek 5At risk

Engineering comments still open; approval blocks the order

Pump order placedWeek 6Waiting

Decision: release order on approval, or hold

Delivery to siteWeek 20Planned

Shifts week for week with the order

Decision needed
Close the open comments on the vendor drawings so the pump order can be released
Impact
Each week of delay moves delivery by a week
Owner
Lead engineer (owner's team)
Due
End of week 5

Possible outputs: baseline programme · milestone plan · progress and cost tracking · short look-ahead

03

Cost & change

Every change has a reason, a price and a decision. The owner sees the effect before approving, not after.

See the sample
Change record 03Illustrative sample — not project data
Change
Add a glazed partition to the meeting room
Requested by
Owner
Cost effect
Two quotes received; difference under review
Time effect
None if ordered by week 6
Status
Waiting for owner decision

Possible outputs: budget tracker · change register · payment review notes

04

Decisions & meetings

A meeting is useful only if what was decided is still visible next week.

01

Issue raised, with its effect

02

Decision recorded

03

One owner, one date

04

Checked until closed

Weekly site meeting · open itemsIllustrative sample — not project data
IssueImpactDecisionOwnerDueStatus
Exhaust route clashes with a beamCeiling work on holdRevised route; confirm on siteDesignerThu, wk 2Open
Light fittings not selectedRisk to opening dateOwner chooses from two optionsOwnerMon, wk 2Waiting
Partition quote above budgetJoinery over allowanceSecond supplier askedProject managerTue, wk 2Open
Fire alarm drawings need approvalCeilings cannot closeAppointed consultant submitsConsultantFri, wk 1Submitted

AI use: tools may help draft minutes; a person reviews every summary before it is shared, and meetings are recorded only with the participants' agreement.

Want this for your own team, without a full project assignment? See Practical tools · meetings.

05

Design, supply & site

Insulated pipelines of different sizes run side by side towards process units
Industrial site, Iran — not a HUMAY project

Designers, suppliers and contractors work from the same information, and each technical decision is taken by the party appointed to take it.

See the sample
Engineering coordination · interface trackerIllustrative sample — not project data
InterfaceBetweenOpen pointStatus
Pump baseplate and foundationVendor · civilAnchor bolt layout to match final vendor drawingOpen
Motor power supplyVendor · electricalConfirm motor rating before cable sizingClosed
  • Document register and revision tracking
  • Comments logged, answered and closed
  • Interfaces between disciplines followed until agreed
  • Quotes compared on technical and commercial terms

Possible outputs: document register · comment log · interface tracker · tender comparison

06

Reporting to the owner

Two people in hard hats walk a roof, one holding a tablet, checking equipment
Concept image

Short, regular and in plain language. The rhythm is agreed at the start.

A one-page owner summary is shown near the top of this page. See it →

Possible outputs: owner report · decisions-needed list · photo record

07

Documents & handover

Handover is planned from the start: the documents the owner will need once the contractors have left.

See the sample
Handover registerIllustrative sample — not project data
  • As-built drawingsOpen
  • Warranties for equipment and finishesReceived
  • Operation and maintenance manualsOpen
  • Snag list — 14 of 17 items closed3 open

Possible outputs: document register · snag list · handover register

Optional starting point

A focused Project Health Check.

For a project already under way: where it stands, what is holding it up, and which decisions are needed next.

Ask about a Health Check

You receive

  1. A clear picture of progress, cost and open issues
  2. The few decisions that matter most now
  3. A recommended way forward, with who does what

How we start.

Scope, outputs and fee are agreed in writing before work begins.

The habits on this page draw on Mehran’s decades on industrial and energy projects before HUMAY. The people behind HUMAY →

  1. A short scoping conversation

    Where the project stands, who is involved, what worries you.

  2. A written scope and fee

    What we do, what you receive, what stays with other appointed parties.

  3. Start, with a named contact

    One responsible person on our side and an agreed reporting rhythm.

Discuss your project

Tell us where your project stands.

A message is enough to start. We reply in English or Arabic.

Send a short brief
WhatsApp+968 9605 3297
Emailaryanafarrokhrouz@gmail.com
LocationBased in Muscat, Oman
Websitehumaygroup.com
WhatsApp